Home About Price Enquiry Guidance Areas Covered Associate Links Discounts Projects
Edinburgh Waverley Station Refurbishment
Phase 2 Glass Access lifts
On behalf of Jefferson Sheard Architects, My involvement for the Edinburgh Waverley Station Refurbishment was to deliver the Network Rail Grip 4 / 5 stages, effectively the full design and pre-construction package comprising the entire roof of the station, in particular Platform 8 & 9 with the new Market Street foot bridge link, over 1.8 Million people will pass thro every year. I also delivered Phase 2, the glass lifts  adjacent to the Balmoral Hotel & additionally provided Architectural support for the Waverley steps Phase 1 project.
Concept 3D Concept 3d Concept 3D Concept 3D Concept 3D
Phase 1 Waverley Steps / Escalators
Phase 1 Waverley Steps Glass roof
Typical Roof Refurbishment - Close up
Roof Gable end Refurbishment
Roof Refurbishment
Phase 1 Princes Street Entrance
Market street link bridge - Close up
Market Street link bridge - Looking down the stairs
Market Street link bridge - looking towards the stairs
Market Street link bridge - looking towards the stairs close up
Market Street link bridge - lift to Platform
Market Street link bridge - Original post retained from demolished bridge
Market Street link bridge - looking towards the stairs & access lift
Market Street Entrance into Waverley Station
My esteemed colleague Mr Ryan Moffat produced the 3d visuals based on my design drawings with guidance and supervision, he did a great job.
Proposed Design Concept
Platform 8 & 9 Concept 3D
3D view from Waverley Bridge
Market Street link bridge looking East - Concept 3D
Market Street link bridge looking West - Concept 3D
Market Street Entrance Concept 3D
Site Construction Photos
www.Acedesigns-UK.com
Email:  Info@Acedesigns-uk.com Phone:    07775 72 7772 177 Mill Road, Allanton, Shotts ML7 5DD Maz.Plans
Ace Designs
(Scotland)